Hemswell Cliff Odour Control Tank

Project Value

£122,513

Date

Jan 2016

Job

0253.01

Overview

The Watermark design solution reduced manufacture and installation timescales and produced a significant cost saving for the project.

Case Study

Download PDF

Capability

Design, Fabrication, Installation,

sectional-tank

The client intended to construct a Concrete Odour Control Tank but encountered design difficulties with the roof, extraction ductwork and spray head pipework interfaces.

Following review meetings Watermark produced a steel sectional tank design which incorporated a filter bed, extraction ductwork and media bed spray pipework.

The design reduced manufacture and installation timescales and produced cost saving in comparison to a concrete construction.

steel-sectional-tank-design