Specialist in epoxy coated pipework fully compliant with WIMES Water Industry Mechanical and Electrical Specification

Case Study

Download PDF

Capability

Design, Fabrication, Installation,

epoxy_coated_pipework_scan

Specialist refurbishment of Water Treatment Works Potable Water Pumping Stations demonstrates the company’s ability to deliver large bore carbon steel epoxy coated pipework within tight programmes.

Fabrication and welding operations were carried out by coded welders.
Epoxy Coated pipework Pipework is fully compliant with WIMES Water Industry Mechanical and Electrical Specification.

Recent projects involved shotblasting pipework to SA2½ followed by either a Resicoat R4 Aqua Green to 500 µm or a two-pack epoxy using an Interbond primer followed by an Intertherm topcoat all to 250µm.

Installation generally involves striping out existing pumps and ancillary equipment. As headroom is limited equipment is often dismantled in situ and skated out of the Pump House for safe lifting and laydown by mobile crane.

Hydrostatic testing is undertaken and witnessed before being certified.