After
Before

Project

Castle Donington Severn Trent Water

Project Value

£99,414

Date

Nov 2017

Job

0537

Overview

The Watermark design solution was to construct steel structure to support a new sectional stainless steel balancing tank.

Case Study

Download PDF

Capability

Design, Fabrication, Installation,

steel_balancing_tanks

Severn Trent Filter Bed Balancing Tank suffered from structural issues and poor performance.

Severn Trent Water anticipated a six-week shut down and over pumping to another facility while the tank was demolished and replaced with a new concrete tank.

Watermark was asked tasked with providing alternative solution. After completing a GPS survey which became the basis for a 3d model drawing Watermark recommended a steel structure to support a new sectional stainless steel balancing tank.

This solution offered the following benefits:

  • Redundant tank left in place working whilst new installed

  • Shut down reduced to one day removing the need for over pumping to alternative works

  • Greater head of water to improve gravity flow rates enabling faster through puts

  • Fully adjustable weir levels within stainless tank improving balance between settlement tanks to ensure even feeds

  • Improved service life of Severn Trent Water asset

steel_structure_tank

HOW CAN WE HELP YOU?

    CONTACT US NOW

    Start typing and press Enter to search